How Your Order Is Made and Inspected
Seven nodes between an approved sample and shipped goods. Each one produces a record you can ask to see, and each one is reported by email within 24 hours of being reached, so you know where an order is without having to ask.
The sequence
Seven nodes, seven records
Each node below produces a record, and the record exists whether or not anyone asks to see it.
Sampling
The first physical piece from your design, reviewed against the written specification.
Record producedSample specification sheet
Sample approval
You confirm the sample or list the changes. Changes at this point are cheap; the same changes after tooling are not.
Record producedWritten approval or change list
Pre-production sample
Made on the production setup with production tooling and material. Signed by you, then sealed as the acceptance standard for the run.
Record producedSigned and sealed pre-production sample, tolerance sheet
First-article inspection
The first pieces off the line are measured for dimension, material grade, finish and function before the run proceeds.
Record producedFirst-article inspection sheet
In-process inspection
Checks during the run at the points where drift happens: joint strength after welding, coverage after coating, closure function after assembly.
Record producedIn-process inspection log
Outgoing inspection
Sampling inspection on finished goods against the agreed plan, covering dimension, finish, function and packaging.
Record producedOutgoing inspection report
Shipment
Packing, country-of-origin marking verification and documentation for your broker.
Record producedPacking list, origin documentation
What each record contains
What each record holds, so you know what to ask for once an order is in production.
| Record | Contains |
|---|---|
| First-article inspection sheet | Measured dimensions against specification, material grade verification, finish check, operator and date |
| In-process inspection log | Checkpoint, sample size, findings, corrective action if any |
| Outgoing inspection report | Sampling plan applied, sample size, defect classification and counts, accept or reject |
| Coating batch record | Batch, finish, thickness measurement, color comparison against the sealed standard |
| Signed pre-production sample | The physical piece, sealed and labeled by project and order, held in the sample room |
Ask our sales team for how long each record is kept.
Batch consistency
The sealed sample system
A written specification settles what a piece should be. A sealed physical sample settles what it should look like, which is what color disputes are about.
What gets sealed
The signed pre-production sample, and a physical color standard for each finish used in the program. Both are labeled with the project and order reference.
How it is used
Every subsequent run is compared to the sealed piece under a standard light source, never to the previous batch. Comparing batch to batch lets color walk a long way in small acceptable steps.
How long it is held
Retained for the life of the program, so a reorder two years later has something physical to be judged against.
Ask our sales team for the retention period for your program.
Acceptance
Tolerance and what counts as a defect
Tolerance sheet
Dimensional, color, weight and appearance tolerances are issued with the pre-production sample and signed alongside it. Together they form the acceptance standard for the run.
Two of those are standing rules rather than per-order negotiations, so you can have them now. Size is positive only: a piece may run long, never short, and the figure and its unit are set per category. Color and appearance are judged against the sealed standard to the quality grade written into your order, on a scale running A+ through C with A the strictest.
The weight tolerance and the defect-rate tiers that decide what is and is not a valid claim are set in the quotation and contract for each order, because a page promising a remedy the contract does not contain creates the exposure it was meant to reduce. Ask our sales team for the figures for your order.
Where this connects
The tolerance sheet is what a quality claim is assessed against. The claim window, the evidence a claim needs and the remedy ladder are set out separately.
Quality claims and remediesFrequently asked questions
What inspection standard do you work to?
Outgoing inspection runs on a sampling plan agreed for the program, covering dimension, finish, function and packaging. The plan is agreed before production, so nobody is reading it for the first time in an argument about a batch. The working principle is every piece conforming, not a sample of them; where a lot cannot be checked piece by piece, our standing acceptance level is AQL 2.5. The sampling standard and inspection level that sit around that number are written into your inspection protocol, because those are the part that changes with the program.
What is a pre-production sample for, if we already approved a sample?
A sample proves a design can be made. A pre-production sample proves it can be made on the production setup, with production tooling, production material and the operators who will run the job. They are different questions, and the second is where problems usually surface. Once you sign it, it is sealed and becomes the acceptance standard for the run.
How do you keep color consistent between batches?
With a physical sealed standard from the approved order, retained and labeled by project, and compared under a standard light source. Every subsequent coating run is compared to that piece, not to a screen value or to the previous batch. Comparing to the previous batch is how a color drifts a long way in small steps.
What is your defect rate?
Not published, because a defect rate without a measurement basis and a time window is a number that cannot be checked and therefore should not be believed. Ask our sales team for details.