Custom 316L stainless steel jewelry manufacturing for US brands

Resources

MOQ and Lead Time, by Project Type

Both custom routes share one floor of 100 pieces per design. What differs between them is tooling and lead time, and in-stock buying is served elsewhere. This page also covers what a landed cost is made of, and how to get one worked out for your own tariff lines.

Route 1

Buying in stock

Not what this site is for, and saying so saves you time.

What it is

Existing catalog pieces, unmodified, bought in small quantities. No tooling, no sampling, no development.

Where it is served

At kalenofficial.com, not here. This site handles custom manufacturing, and routing an in-stock order through a custom inquiry process wastes a fortnight for both of us.

As that site published them in July 2026: no minimum order quantity, dispatch within 48 business hours, and a 60-day returns window on stock pieces sent back unworn, with their tags, in the original packaging. Customized pieces are not covered by that returns window, one of the reasons the two routes are kept apart. Check that site for its current position before relying on any of it.

Route 2

Light customization

An existing piece with your changes: logo, dimension, plating color, chain length, packaging. Usually no new tooling, which is what makes this route cheaper and faster than development, though the minimum itself is the same 100 pieces per design either way.

What the minimum counts is one design. A run splitting across several finish colors is several designs for this purpose, which is the thing most likely to move a quotation.

Light customization terms
TermPosition
Minimum per design100 pieces
Sample feeAsk our sales team for details.
Fee credited against productionAsk our sales team for details.
Typical dispatch timeBy forming process: 10–20 days cut or turned, 30–35 stamped or cast, 25–35 brass or silver cast (45–60 at high volume)
When that date is fixedConfirmed in writing within 3 days of the order
If it slipsYou hear at least two weeks before the date
ToolingUsually none; existing tooling is reused

Route 3

Original development

Your design, made from scratch. The minimum is the same 100 pieces per design as light customization. What a new structure adds is tooling, which is quoted as its own line rather than buried in a higher floor.

That is deliberate. A supplier can hide a tooling cost by raising the minimum instead of charging for the tool, which makes the two look like different things when they are the same money. Asking for it itemized is the way to tell one from the other, here or anywhere else.

Who owns the tooling once it is paid for
Original development terms
TermPosition
Minimum per design100 pieces
Tooling feeAsk our sales team for details.
Development sample feeAsk our sales team for details.
Pre-production sampleRequired step
Typical dispatch time, development sampleNo more than 40 days from the order, barring a production exception
Typical dispatch time, bulkStarts at sample sign-off, then as Route 2: 10–20 days cut or turned, 30–35 stamped or cast, 25–35 brass or silver cast (45–60 at high volume)
When those dates are fixedConfirmed in writing within 3 days of the order
If either slipsYou hear at least two weeks before the date

For your importer

What a landed cost is made of

The unit price is one line of several. A quotation that stops at the unit price is not comparable to one that does not.

Incoterms responsibility split
TermWe arrangeYou arrangeWhere title and risk pass
EXWGoods ready at the factoryEverything from the factory door onwardAt our door
FOBExport clearance and delivery to the portOcean or air freight, import clearance, duty, final deliveryWhen loaded at the port of origin
CIFFreight and insurance to the destination portImport clearance, duty, final deliveryAt the destination port
DDPEverything including import clearance and dutyReceiving the goodsOn delivery

Cost components

  • Unit price at the agreed quantity band
  • Tooling, where applicable, usually a one-time cost per design
  • Packaging, if it is not the standard polybag
  • Freight, which varies by mode, route and season
  • Duty, determined per tariff line at entry
  • Merchandise processing and harbour fees, where applicable
  • Customs brokerage
  • Insurance, where you carry it

Request a landed-cost worksheet

Tell us the product categories, quantities and destination state, and we will itemize duty layers, processing fees and brokerage per tariff line, dated and marked as an estimate. Send it through the quote form with "landed cost" in the message.

Request a worksheet

Timing

Dispatch time is not delivery time

Dispatch time

When the goods leave the factory, inspected and packed. This is the part we control and the part we commit to.

The band that applies to you depends on how the piece is formed, and it is in the route table above. A development program also carries a separate sample clock ahead of it. Whichever applies is confirmed in writing within three days of the order, and if it slips you hear at least two weeks before the date.

Estimated delivery

Dispatch plus international transport plus customs clearance. It varies by mode, route and season, and it is quoted as a range with the assumptions stated rather than as a date.

A US supplier holding stock domestically will beat this on speed. If speed is the deciding factor for your line, that is worth knowing before you start.

Frequently asked questions

Why does custom work have a minimum at all?

Because the cost of a run is mostly not the pieces. Setting up tooling, qualifying a coating color, running first articles and inspecting a batch cost roughly the same whether the run is fifty pieces or five hundred. Below a certain quantity the setup dominates the price so completely that the unit cost stops being useful to you.

Is your dispatch time the same as delivery time?

No, and the distinction matters more here than almost anywhere else on this site. Dispatch time is when goods leave the factory. Delivery time adds international transport and customs clearance, which are outside our control and vary by route and by season. We quote both separately and we never present the first as the second.

Can you quote DDP?

It can be discussed per order. DDP moves import clearance, tariff classification under HTS Chapter 7117 (imitation jewelry), and duty handling onto us, which means the quotation has to carry an assumption about a rate that is only fixed at entry. For US buyers requesting DDP shipping directly to commercial warehouses or fulfillment facilities via air express (such as FedEx or DHL), terms are arranged case by case rather than offered as a standing blanket rate. Ask our sales team for DDP terms.

What are the payment terms for a custom order?

Custom production orders typically follow milestone terms: a standard deposit (typically 30% upon sample and tooling sign-off) to commence manufacturing, with the remaining balance due prior to final factory dispatch, payable via wire transfer (T/T).

Specific milestones, accepted currencies (USD), and schedule details are confirmed in your written quotation and proforma invoice. This site has no checkout and does not take consumer online payments. Kalen's official store also lists PayPal, credit card and bank transfer (T/T) among its payment options for standard orders. Source: kalenofficial.com.

Do you collect US sales tax?

We sell wholesale for resale. Buyers handle their own state tax obligations, which is typically documented with a resale certificate. We are not in a position to advise on your state position and this page is not the place where that gets settled. Your accountant is.

What is the smallest order you will take?

100 pieces per design, and that is the floor on both custom routes, light customization and original development alike. What changes between them is tooling and lead time, not the minimum. In-stock purchasing is a separate matter and is served at kalenofficial.com, on that site’s terms.

See also the sample program for what happens before a production quantity is decided.

Last updated

Get a QuoteStart With a Sample
Chat with us on WhatsApp