Custom 316L stainless steel jewelry manufacturing for US brands

Resources

How Sampling Works at Kalen

Three sample routes, depending on how far your design has traveled. Each one answers the same six questions (fee, tooling, credit, lead time, freight and duty, revisions), so you can compare the routes with each other and with any other supplier.

Choose a route

Which of these is you?

Each route proves something different and costs something different. Picking the wrong one usually means paying for evidence you did not need.

A · Quality sample of an existing design

You want to see the material, the finish, the weight and the packaging before committing to anything. Nothing is modified, so the sample puts our build quality in your hand.

B · Light customization sample

An existing piece with your changes: logo, size, plating color, chain length, packaging. The sample shows that your changes land the way you expect.

C · Original development sample

Your design, from a sketch, drawing or CAD file. It may need tooling before a sample can exist at all. The sample shows that the design can be made, and what making it will cost.

Route A

Quality sample of an existing design

The cheapest way to answer "is this factory any good". You receive unmodified pieces from the existing range, with the specification sheet that describes them, so you can check the claims against the object.

What to look at: weld and solder joints, coating coverage at edges and on findings, closure function, weight against your expectation, and how the piece is finished on the back where nobody photographs it.

Sample route terms
TermPosition
Sample feeAsk our sales team for details.
Tooling billed separatelyNot applicable. No tooling is involved
Credited against productionAsk our sales team for details.
Lead time bandWithin 48 business hours, as kalenofficial.com published it in July 2026. A stock piece ships from that storefront, not from a production run here
Freight and dutyConfirmed in writing on the sample quotation before anything ships
Revisions includedNot applicable. Nothing is being modified

Route B

Light customization sample

An existing piece with defined changes. The usual set is logo or engraving, a dimension, a plating color, a chain length, or packaging.

A short feasibility check runs first: some changes that sound small are not. Moving an engraving onto a curved surface, or a plating color that is not in the qualified range, changes the process rather than the setting.

Sample route terms
TermPosition
Sample feeAsk our sales team for details.
Tooling billed separatelyUsually not. Most light changes reuse existing tooling
Credited against productionAsk our sales team for details.
Lead time band7 days cut or turned; 20–25 stamped or cast; 10–15 brass or silver cast
Freight and dutyConfirmed in writing on the sample quotation before anything ships
Revisions includedA defined number, then a per-revision charge

Route C

Original development sample

Your design, built from scratch. This route has more nodes than the others because more can go wrong, and each node exists to catch something specific before it becomes expensive.

Tooling ownership, design ownership and exclusivity are settled in writing before development starts, not after the sample exists and the negotiating position has changed.

NDA, tooling and design ownership
Sample route terms
TermPosition
Sample feeAsk our sales team for details.
Tooling billed separatelyQuoted separately where a new die or mold is required
Credited against productionAsk our sales team for details.
Lead time bandNo more than 40 days from the order, barring a production exception. Within that: about 7 days cut or turned, 20–25 stamped or cast, 10–15 brass or silver cast
Freight and dutyConfirmed in writing on the sample quotation before anything ships
Revisions includedA defined number; a structural change re-opens DFM and counts as a new cycle
  1. NDA, if you want one

    Mutual, and agreed before any detailed design review. On the quote and design forms it is a box left unticked by default; on a sample request, ask for it in your reply. We do not decide this on your behalf.

  2. DFM review

    Minimum wire diameter, solder joints, achievable tolerance, coating adhesion, structural risk. You get the constraints in writing before committing.

    Record producedWritten DFM review

  3. Sample quotation

    Priced against what the review found, including tooling if it is needed. Nothing is charged before you accept it.

  4. Development sample

    The first physical piece, reviewed against the written specification.

    Record producedSample plus specification sheet

  5. Revisions

    Within the included count. A dimensional adjustment counts as a revision. A structural change re-opens the question of whether the piece can be made, so it is treated as a new cycle.

  6. Pre-production sample

    Made on the production setup with production tooling and material. Signed by you, then sealed as the acceptance standard for the run.

    Record producedSigned and sealed pre-production sample, tolerance sheet

While it is running

How you find out where it is

Node reporting

Each node is reported by email within 24 hours of being reached, so you should not have to ask where a sample is.

Between updates

There is no customer login or tracking page. To ask where a sample stands, reply to any of those emails and quote the reference shown when you sent your request.

Frequently asked questions

Do you offer free samples?

No. A free sample program at any scale attracts volume from people who will never order, and that cost lands on the customers who do. A paid sample is the first sign that a project is real, and the fee pays for the time we put into it.

Is the sample fee credited against a production order?

The sample quotation states whether any part of the fee is credited against a production order, so it is settled before anyone invoices. Ask our sales team for the current credit terms.

How many revisions are included?

The sample quotation states how many are included and what a further one costs. A dimensional adjustment counts as a revision. A structural change counts as a new development cycle, because it re-opens the question of whether the piece can be made. Ask our sales team for the number for your route.

Who pays the shipping and the duty on a sample?

It is confirmed in writing on the sample quotation before anything ships. Sample shipments cross a border and can attract duty, and the party responsible should never be discovered from a courier invoice after the fact. Ask our sales team for how it is usually split.

Can I track a sample?

A person emails you within 24 hours of each node being reached: sampling started, sample shipped, pre-production sample confirmed. To ask about a sample between updates, reply to any of those emails and quote the reference shown when you sent your request.

To start, use Start With a Sample and pick the route. You will get a feasibility read and a sample quotation before anything is charged.

Last updated

Get a QuoteStart With a Sample
Chat with us on WhatsApp